Construction of new ARCC Foyer Finished

ARCC Innovations is very pleased to announce that the construction of our new front of house has been completed.

Outside.jpg

With a sleek and spacious, open-plan design, the ARCC reception is now joined by a welcoming foyer, a large lounge area complete with sofas and coffee tables, as well as a fully functional canteen and kitchen. In addition, ARCC now offers more unisex and accessible facilities, including two showers and a changing room.

Research and Development resumes at ARCC

After the necessary hiatus, ARCC has finished this exciting extension project. Thankfully, our site’s rural location, relative distance from urban centres and copious green space, has meant maintaining social distance has not drastically disrupted our services. And with essential PPE in place, ARCC’s design offices, technical lab, and testing facilities all continue to operate as normal.

Whether you are a customer, small business, or new talent, ARCC welcomes all those interested in our business and products to pay a visit to our accommodating site, located just outside of Cambridge, with plenty of visitor parking available.

This includes those who wish to test ride one of ARCC Bikes’ electronic models, fitted with our Intelligent Drive System, including the ARCC-designed Rosemont and Abington, the iconic Brompton, or the fully customisable Moulton TSR. As well as those who would like a demonstration of the revolutionary sound quality of Node, or the award-winning practicality and sustainability offered by Mannequino’s products.

ARCC.JPG

Now that work has fully resumed at ARCC, and with a general return to normality on the horizon, new and exciting projects like our ground-breaking Folding Bike and the Invisivisor are again underway. And with such good news, all of us here at ARCC, including ARCC Bikes, Studio 17, Node and Mannequino, look confidently to the future.